The Rigging Safety Safe Work Method Statement is designed for employers so they can instruct their employees and contractors on how to perform Rigging Safely.
This OHS Procedure comes in an MS Word format for easy editing if you wish to add site specific risks.
Additional Safety Notes
Before Lifting:
- Inspect harness for damage
- Inspect and insure correct operation of inertia reel.
- Check that the anchor point or static line are correctly located and have not been damaged.
- Ensure that the harness is correctly fitted, adjusted and connected to anchor point or static line.
Rigging With Chains
Check for damage such as:
- Stretching or bending of links
- Small dents on the surface of links
- Wear on parts of the links that seat each other
- Deformation
- Rust, nicks or gouges, pitting or corrosion and
- Links that are locked or without free movement.
The Safety Procedure includes:
- Risk Assessment
- Site Awareness
- Operators Requirements
- Personal Protective Equipment
- Pre-Start Checks
- Dogman Instructions
- Eye bolts, Slings
- Weights
- And much more
- 5 Page Complete Procedure
- MS Word Format
- Ready To Use
- Version 4.0
< < Back
Buy Now